top of page
Search

Comprehensive Technical White Paper Moisture Mitigation Through Controlled PCBA Baking in RMA, Repair, and Rework Operations

A Deep-Dive into Mechanisms, Parameters, Material Behavior, and Best Practices for Electronics Manufacturing Services (EMS)


By: Steven Mui



1. Introduction


Within a high-reliability Electronics Manufacturing Services (EMS) environment—spanning medical, aerospace, automotive, datacenter, and networking applications—Printed Circuit Board Assemblies (PCBAs) entering the RMA and rework cycle present unique risks. Unlike new production builds, RMA units have unknown environmental exposure, uncontrolled humidity history, field-induced degradation, and multiple prior thermal cycles. As a result, these units often contain absorbed moisture in the substrate, solder mask, dielectric layers, and plastic integrated circuit packages.


When subjected to secondary thermal processes (hot-air rework, BGA reflow, selective solder, IR preheaters, or localized heating), this trapped moisture can flash into steam, generating internal pressures capable of causing:


  • CAF (Conductive Anodic Filament) initiation

  • Interlaminar delamination between prepreg layers

  • “Popcorning” of MSL components

  • Die-attach or package delamination in ICs

  • Pad cratering

  • Microvia fracture or barrel cracking

  • Voiding under QFN thermal pads

  • Solder blowholes due to substrate outgassing

  • Copper-trace lift or blistering under solder mask


The controlled baking of PCBAs prior to rework mitigates these risks by driving out retained moisture, stabilizing the dimensional and mechanical behavior of the laminate, and ensuring the integrity of subsequent thermal excursions.


This paper provides a complete technical treatment of the subject, integrating principles from IPC-1601, J-STD-033, J-STD-075, IPC-6012, IPC-A-610, and typical EMS internal specifications.



2. Moisture Absorption Fundamentals in PCBA Materials



2.1 Hygroscopic Nature of the PCB Stack-Up


A PCB stack-up contains multiple hygroscopic materials:


  • FR-4 epoxy resin (main moisture reservoir)

  • Glass fiber reinforcement (absorbs moisture into fiber bundles)

  • Prepreg layers with epoxy cross-link networks

  • Solder mask polymer matrix

  • Dielectrics under microvias

  • Copper oxide layers (moisture-sensitive interface)

  • Underfill and corner-bond epoxies used on BGAs


Moisture absorption is a function of:


  • Material porosity

  • Epoxy cross-link density

  • Storage humidity

  • Temperature cycles experienced in the field

  • Time out of dry pack (for MSL-rated devices)


In field deployments, PCBAs may absorb 0.05–0.5% moisture by weight, which is sufficient to drive mechanical failure.



2.2 Moisture Sensitivity in IC Packaging


Plastic ICs contain molding compounds that readily absorb moisture. This is why MSL (Moisture Sensitivity Level) ratings exist per J-STD-020 / J-STD-033.


Common MSL rates:


  • MSL1: Unlimited floor life at ≤30°C / 85% RH

  • MSL2A–3: 4–168 hours

  • MSL4–6: 24 hours → 8 hours floor life


Once exceeded, the device must be baked prior to reflow or hot-air rework to avoid package rupture or delamination.



2.3 Solder Mask Absorption and Surface Degradation


Solder mask (often LPI epoxy) absorbs moisture into:


  • Micro-porous regions

  • Via caps

  • Surface roughness zones

  • Cracks from previous rework


During heating, solder mask can:


  • Blister

  • Delaminate

  • Expand unevenly

  • Trap volatiles leading to soldering defects



3. Failure Mechanisms from Moisture Exposure During Rework


When moisture turns into steam, pressure increases rapidly (300–600 psi). This causes:



3.1 Popcorning in IC Packages


  • Explosive expansion of moisture inside the molding compound

  • Crack propagation from die attach to package surface

  • Leadframe delamination

  • Internal bond wire breakage


Common during hot-air BGA removal and QFN rework.



3.2 PCB Delamination (Z-Axis Separation)


Z-axis expansion from superheated moisture causes:


  • Separation of resin from glass bundles

  • Prepreg swelling

  • Delamination between internal layers

  • “White ring” around through-holes


This permanently weakens mechanical integrity.



3.3 Pad Lifting and Trace Separation


During rework, lifted pads often occur because:


  • Moisture expands under the copper pad

  • Resin softens due to thermal stress

  • Shear forces from the soldering iron or hot air cause copper detachment



Baking greatly reduces this risk.



3.4 Internal Via and Microvia Cracking


Outgassing stresses the copper barrel, leading to:


  • Barrel cracks

  • Corner fractures in microvias

  • Intermittent open circuits

  • Latent defects detected only after environmental stress screening (ESS)



3.5 Solderability Defects


Moisture causes:


  • Flux boil-off

  • Blow holes

  • Voids in QFN pads

  • Expulsion of solder causing uneven fillets

  • Outgassing through plated through-holes




4. Technical Baking Parameters for RMA and Rework


These parameters align with IPC-1601, J-STD-033, and EMS best practices.



4.1 Standard Populated PCBA Bake Conditions


Temperature

Time Duration

Use Case

105°C

8-12 hours

Industry standard for mixed-technology RMA assemblies

90°C

12-24 hours

Heat-sensitive plastics, nylon connectors

80°C

24 hours

Boards with LCDs, optical sensors, adhesives

60°C

24-48 hours

Conformal-coated assemblies, medical sensors



4.2 Bare PCB Bake Conditions


Bare boards tolerate higher temperatures:


  • 120–150°C for 4–12 hours depending on Tg

  • Used to remove high moisture content or prep boards before high-reliability operations (underfill, staking, conformal coat)



4.3 MSL Component Recovery


For ICs removed from reels/moisture barrier bags:


  • 125°C for 24 hours (standard per J-STD-033)


    On populated boards: reduce to 90–105°C to protect connectors and plastics.



4.4 High-Tg Material Bake


For Tg170+ materials (high-reliability laminates):


  • 110–125°C acceptable

  • Accelerates moisture removal without resin softening



5. Material Behavior Under Bake Conditions


5.1 Coefficient of Thermal Expansion (CTE) Management


Moisture increases the CTE of epoxy resin.

Drying the board:


  • Lowers Z-axis expansion

  • Reduces mismatch between copper and resin

  • Minimizes the risk of plated through-hole (PTH) breakage during reflow



5.2 Glass Transition Temperature (Tg) Restoration


Wet boards exhibit a temporary drop in Tg (softening point). Baking restores the Tg to its proper functional level, preventing:


  • Warpage

  • Resin deformation

  • Layer shifting during rework



5.3 Reduction of Outgassing in Vias


Vias with absorbed moisture produce blowholes; drying eliminates this risk.



6. Impact of Baking on Rework Reliability



6.1 BGA Reballing and Reflow Success


Baking improves:


  • Co-planarity

  • Wetting

  • Ball collapse uniformity

  • Thermal pad voiding prevention

  • Interfacial adhesion between solder and PCB



6.2 QFN / LGA Rework


QFN thermal pads trap moisture due to bottom-side exposure—baking prevents:


  • Voiding

  • Outgassing

  • Underpad delamination



6.3 Through-Hole Rework


Moisture creates pathways for:


  • Blowholes

  • Incomplete hole-fill

  • Voids in barrel plating


    Baking stabilizes the entire resin-glass system.



6.4 Preventing Warpage


Moisture-heavy boards warp when heated, negatively affecting:


  • BGA alignment

  • Automated rework machine pickup

  • Solder paste deposition during rework stencil application


Baking minimizes bow-and-twist.



7. Process Implementation in EMS Rework Flow


7.1 Incoming RMA Assessment


  • Document SN, PN, rev, customer history

  • Inspect for corrosion, oxidation, delamination

  • Evaluate solder joints under microscope/X-ray

  • Assess component MSL exposure

  • Determine assembly heat limitations



7.2 Pre-Bake Preparation


  • Remove labels incompatible with 100°C

  • Disconnect batteries or FRAM modules

  • Remove foam, silicone pads, adhesives prone to melting

  • Attach TEMP/RH indicators if required for customer traceability



7.3 Bake Execution Controls


  • Use a calibrated oven (±5°C tolerance)

  • Maintain vertical airflow circulation

  • Load boards vertically to maximize convection

  • Avoid direct contact with metal surfaces

  • Use thermocouples for critical medical/aerospace products



7.4 Post-Bake Handling


  • Allow slow cool-down to room temperature

  • Begin rework within 8 hours for best results

  • If delayed beyond 24 hours, boards may require rebake depending on humidity conditions



8. Documentation for ISO/IATF/Medical Customers


A compliant EMS environment should maintain:


  • Bake lot traveler forms

  • Temperature/time logs

  • SN-level traceability

  • Oven calibration certificates

  • Deviation approvals (if temp/time varies)

  • MSL reset records (for J-STD-033 compliance)

  • Rework/repair logs

  • QA inspection before & after rework

  • X-ray or AOI validation after repair


Medical and aerospace customers often require retention of these documents for 7–10 years.



9. Example Decision Matrix for Process Engineers


Field Condition

Bake Required

Parameter

Notes

Unknown storage >30 days

Yes

105°C x 10 hr

Standard RMA bake

Exposure to condensation/water ingress

Yes

105°C x 12 hr

Moisture likely absorbed deep in laminate

High-density BGA/QFN

Yes

105°C x 12 hr

Reduce voiding

Conformal-coated

Yes

60-70°C x 24-48 hr

Prevent coating damage

Heat-sensitive connectors

Yes

90°C x 12 hr

Avoid deformation

High-Tg laminate

Optional

120°C allowed

Use for time reduction

LCP or PPS connectors populated

Caution

90°C



10. Quantitative Benefits of Baking


Data from EMS industry studies show baking yields:


  • Up to 70% reduction in pad lifting

  • 40–60% reduction in BGA voiding

  • >90% elimination of popcorning failures

  • 30–50% reduction in barrel cracking during rework

  • 60–80% improvement in solder paste wetting consistency

  • Nearly 100% elimination of outgassing blowholes


This directly increases:


  • RMA recovery success

  • First-pass rework yield

  • Customer satisfaction

  • Scrap reduction

  • Throughput efficiency in rework cell



11. Conclusion


Controlled PCBA baking is an essential pillar of any advanced EMS rework and RMA recovery process. Moisture contamination—often invisible and unpredictable—poses significant risks to mechanical, thermal, and soldering integrity. By applying appropriate bake conditions based on material properties, MSL classifications, and assembly constraints, EMS organizations can dramatically improve:


  • Reliability of rework

  • Post-repair electrical integrity

  • BGA/QFN reflow performance

  • Substrate stability

  • Overall recovery yield

  • Customer compliance with IPC and medical/aerospace industry standards



A properly executed bake procedure is one of the most effective preventive controls available in the RMA workflow. It transforms rework from a high-risk activity into a stable, repeatable, quality-assured process aligned with global manufacturing standards.


 
 
 

Comments


Drop Me a Line, Let Me Know What You Think

Thanks for submitting!

© 2035 by Someone's Blog. Powered and secured by BCS Media Studio

bottom of page